Close Menu
  • Home
  • AI
  • Business
  • Market
    • Media
      • News
    • Politics
  • Sports
  • USA
  • World
    • Local
  • Breaking News
  • Health
  • Entertainment & Lifestyle

Subscribe to Updates

Subscribe to our newsletter and never miss our latest news

Subscribe my Newsletter for New Posts & tips Let's stay updated

What's Hot

Analyst Dan Ives says it will be the summer of $4 trillion market caps for surging tech giants

Google makes first foray into fusion in venture with MIT spinoff Commonwealth Fusion Systems

Congress might block state AI laws for five years. Here’s what it means.

Facebook X (Twitter) Instagram
  • Home
  • About Us
  • Advertise With Us
  • Contact Us
  • DMCA
  • Privacy Policy
  • Terms & Conditions
Facebook X (Twitter) Instagram
BLMS Media | Breaking News, Politics, Markets & World Updates
  • Home
  • AI
  • Business
  • Market
    • Media
      • News
    • Politics
  • Sports
  • USA
  • World
    • Local
  • Breaking News
  • Health
  • Entertainment & Lifestyle
BLMS Media | Breaking News, Politics, Markets & World Updates
Home » Amazon joins the big nuclear party, buying 1.92 GW for AWS
AI

Amazon joins the big nuclear party, buying 1.92 GW for AWS

BLMS MEDIABy BLMS MEDIAJune 13, 2025No Comments3 Mins Read
Share Facebook Twitter Pinterest Telegram LinkedIn Tumblr Email Copy Link
Follow Us
Google News Flipboard
Share
Facebook Twitter LinkedIn Pinterest Email Copy Link


Amazon tapped into an emerging trend this week, one that’s seeing big tech firms buy power from existing nuclear power plants.

The tech company will power a chunk of its AWS cloud and AI servers using 1.92 gigawatts of electricity from Talen Energy’s Susquehanna nuclear power plant in Pennsylvania. Amazon is the latest hyperscaler to go direct to big nuclear operators, following on the heels of Microsoft and Meta.

Amazon’s deal was announced Wednesday, but it’s not entirely new, instead modifying an existing arrangement with Talen. The old version had Amazon building a data center next to the Susquehanna power plant, siphoning electricity directly from the facility without first sending it to the grid.

That deal was killed by regulators over concerns that customers would unfairly shoulder the burden of running the grid. Today, Susquehanna provides power to the grid, meaning every kilowatt-hour includes transmission fees that support the grid’s maintenance and development. Amazon’s behind-the-meter arrangement would have sidestepped those fees.

This week’s revisions shift Amazon’s power purchase agreement in front of the meter, meaning the AWS data center will be billed like other similar customers who are grid-connected. The transmission lines will be reconfigured in spring of 2026, Talen said, and the deal covers energy purchased through 2042.

But wait, there’s more: The two companies also said they will look to build small modular reactors “within Talen’s Pennsylvania footprint” and expand generation at existing nuclear power plants. 

Expanding existing power plants is typically an easier way to add new nuclear. They might include switching to more highly enriched fuel to produces more heat, tweaking the settings to squeeze out more power, or renovating the turbines for a bigger bump. 

Microsoft kicked off the trend last year when it announced that it would work with Constellation Energy to restart a reactor at Three Mile Island, a $1.6 billion project that will generate 835 megawatts. Meta hopped aboard earlier this month, also with Constellation, to buy the “clean energy attributes” of a 1.1 gigawatt nuclear power plant in Illinois.

Amazon and Talen’s pledge to build new small modular reactors is a longer shot, though there, too, Amazon is in good company with its peers. Several startups pursuing the concept with the hopes of cutting construction costs by mass producing parts. Amazon has invested in an SMR startup, X-energy, which is planning to add 300 megawatts of nuclear generating capacity in the Pacific Northwest and Virginia.

New generation at existing reactors and new SMRs are intended “to add net-new energy to the PJM grid,” Talen said, referring to the region’s grid operator. That last bit is likely a bid to head off any criticism from regulators about leaving ratepayers holding the bag.



Source link

Follow on Google News Follow on Flipboard
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email Copy Link
Previous ArticleStartups Weekly: No sign of pause
Next Article Kyle Richards Back for Real Housewives of Beverly Hills Season 15
BLMS MEDIA
  • Website

Related Posts

Congress might block state AI laws for five years. Here’s what it means.

June 30, 2025

A comprehensive list of 2025 tech layoffs

June 30, 2025

Google embraces AI in the classroom with new Gemini tools for educators, chatbots for students, and more

June 30, 2025
Add A Comment
Leave A Reply Cancel Reply

Top Posts

Nova Scotia: Siblings Lily, 6, and Jack, 4, have been missing in rural Canada for four days

May 6, 202515 Views

Families of Air India crash victims give DNA samples to help identify loved ones

June 13, 20258 Views

Australia’s center-left Labor Party retains power as conservative leader loses seat, networks report

May 3, 20254 Views

These kibbutzniks used to believe in peace with Palestinians. Their views now echo Israel’s rightward shift

May 2, 20254 Views
Don't Miss

Congress might block state AI laws for five years. Here’s what it means.

By BLMS MEDIAJune 30, 20250

A federal proposal that would ban states and local governments from regulating AI for five…

A comprehensive list of 2025 tech layoffs

Google embraces AI in the classroom with new Gemini tools for educators, chatbots for students, and more

How to prepare now for your later-stage raise, live at Disrupt 2025

Subscribe to Updates

Subscribe to our newsletter and never miss our latest news

Subscribe my Newsletter for New Posts & tips Let's stay updated

Our Picks

Analyst Dan Ives says it will be the summer of $4 trillion market caps for surging tech giants

Google makes first foray into fusion in venture with MIT spinoff Commonwealth Fusion Systems

Congress might block state AI laws for five years. Here’s what it means.

Welcome to BLMS Media — your trusted source for news, insights, and stories that shape our world.

At BLMS Media, we are committed to delivering timely, accurate, and in-depth information across a wide range of topics. Whether you’re looking for breaking news, political analysis, market trends, or global developments, we bring you the stories that matter — with clarity, integrity, and perspective.

Facebook X (Twitter) Instagram Pinterest
  • Home
  • About Us
  • Advertise With Us
  • Contact Us
  • DMCA
  • Privacy Policy
  • Terms & Conditions
© 2025 blmsmedia. Designed by blmsmedia.

Type above and press Enter to search. Press Esc to cancel.